The Sonnenalp HotelEngineering for character preservation. The project challenges for this Vail, Colorado icon included the need to match existing architecture with a shared underground garage adjacent to the structure. Challenges included matching the existing floor-to-floor distances and a tight construction schedule, which required design and construction within a 12-month period. Architect: Resort Design Associates International |